Building a garage in Oromocto

Oromocto was redesigned in 1956 as a planned town to serve Base Gagetown, and it still writes its own rules. Before anyone quotes you on a garage here, two Town by-laws have already decided how big it can be, where it can sit, and whether an inspector will ever look at it. Here is what they say, in plain numbers.

The size you pick decides the permit

The Town sorts accessory buildings by floor area, and the line that matters most for a garage is 55 m². Below it, a detached garage goes through a development permit for a flat fee. Above it, you need a building permit charged by the square metre. Nothing detached can exceed 65 m² in a residential zone.

One warning before you rely on that line: the Town's building-permits web page is not consistent with it. The page lists "garage" among the work that needs a building permit, while the same page's forms, the fee schedule in By-law 613 and the development permit application all put an accessory building under 55 m² on the development-permit route. Confirm which one your garage needs with the Planning and Compliance Office before you apply.

Detached garage footprint → what the Town issues → Town fee
FootprintPermitTown fee
Up to 18 m² (a large shed)Development$25
18 to 55 m², e.g. 12×20 ft or 24×24 ftDevelopment$50
Over 55 m² to 65 m², e.g. 24×26 or 24×28 ftBuilding$4.30/m², about $249 to $268
Over 65 m², e.g. 24×30 ftOver the by-law limitonly by variance

A 24×24 ft garage works out to 53.5 m², so it lands in the $50 tier. The largest garage the by-law allows, 65 m², costs about $280 at $4.30 a square metre. The Town's minimum permit fee is $50, and an attached garage on a single-family house is also billed at $4.30/m².

There is a catch in the cheap tier that nobody puts on a quote. The building by-law defines a development permit as one that "pertains primarily to land-use requirements" and says plainly that work permitted under a development permit is not subject to Code inspections. On that wording, the by-law does not require Code inspections of a 53 m² garage's footings or framing. The Town's development permit form still has you acknowledge "the required inspections" and gives the building inspector a right of entry, and its accessory-building schedule prints two foundation details: a thickened-edge slab on grade, and a 4-foot concrete wall on a 16-by-8-inch footing, both in 32 MPa concrete. Ask the Town what it will actually check, and ask your builder what they would have shown an inspector anyway. Plenty of builders pitch 24×30 as the comfortable two-car size (here is the usual case for it); in Oromocto that footprint is 66.9 m², about 2.9% over the cap, and the only route to it is a variance. Zoning By-law 522 lets the Development Officer grant a reasonable variance, and the Planning Advisory Committee holds the same power; neither is obliged to say yes.

Where it can go on your lot

Detached garage placement under Oromocto Zoning By-law 522, section 5.1 A residential lot seen from above. The garage sits behind the house, at least 1.5 metres from the side lot line and 3.0 metres from the rear lot line, with no side longer than 10 metres and no more than 65 square metres of floor area. rear lot line street house garage ≤ 65 m² ≤ 4.6 m tall ≥ 3.0 m ≥ 1.5 m no side over 10 m garage stays behind the house front
Section 5.1 of Zoning By-law 522, drawn to show relationships, not to scale.

By-law 522 has been the Town's zoning by-law since it was registered in April 2017. Its accessory-building section sets the envelope a detached garage has to fit:

  • Height: 4.6 m at most in any residential zone. The Town's own drawing sheet marks it "15' MAX".
  • Footprint: no more than 65 m², and no horizontal dimension over 10 m.
  • Side lot line: 1.5 m for anything over 18 m², 1.0 m for smaller buildings.
  • Rear lot line: 3.0 m, and never on an easement unless the utility agrees.
  • Position: not forward of the main building.
  • Count: two accessory buildings per lot, and that count includes greenhouses and any small storage shelter left standing year-round.
  • Coverage: all accessory buildings together may cover at most 10% of the lot. A full 65 m² garage needs a lot of at least 650 m² with nothing else on it.

An attached garage is treated differently. It does not count toward the two-building limit, but the by-law only accepts it as attached if it is "structurally attached by way of the foundation and integrated into the main structure of the dwelling". A garage butted against the house on its own slab does not meet that definition, so it is not an attached garage in the by-law's eyes. Getting that foundation joint right is its own job (how the tie-in into an existing foundation is done).

If a permanent garage does not fit, the same by-law allows one temporary storage shelter per residential lot from November 1 to April 30. It can be up to 5.5 m wide, 7 m long and 3 m high, set 0.6 m from side lines and 1.5 m from front and rear lines, and it takes a $25 development permit.

Who actually lives in these houses

The 2021 Census counted 3,665 occupied dwellings in the Town of Oromocto. Three numbers from that count shape garage work here more than any climate talk does:

50.6%
of households rent: 1,855 renters to 1,810 owners. The Town's building and development permit forms both ask for the legal property owner, so a tenant's garage plan starts with the landlord.
22.5%
of homes are semi-detached or row houses (825 of them). Where a lot is narrow, the 1.5 m side setback and the 10% coverage cap are the limits to check first.
46%
were built in 1980 or earlier: 655 by 1960 and 1,040 between 1961 and 1980. That date matters when an old garage has to come down, as the next section explains.

Single-detached houses account for 2,220 homes, about 61%, and apartments for another 610. The Town's 2016 Municipal Plan traces the mix back to its founding: the 1956 master plan by McGill planner Harold Spence-Sales put schools at the centre of each neighbourhood and ran the power lines underground, which is worth remembering before anyone digs.

Tearing down the old garage first

The Town will not let anything be demolished without a demolition permit. For a garage it is $80, the flat fee for any building under 600 m². Before the Town issues it, the Demolition Clearance Application has to come back with sign-offs that the water and sewer services are capped and that NB Power, Enbridge Gas, Bell Aliant and Rogers have each been contacted. It also asks whether there are wells on the property, and it asks for an asbestos inspection report, and removal, for anything built before 1980. Nearly half of Oromocto's homes were built in 1980 or earlier.

In practice that means a demolition quote should say who is getting the asbestos determination and who is arranging each disconnection. If it only prices the excavator and the bin, you are the one left doing the paperwork. (What a tear-down and rebuild costs in nearby Fredericton, with the abatement line broken out.)

Digging, surveys and the foundation

Oromocto's current building by-law was registered in November 2024, and it puts more paperwork in front of the excavator than most people expect for a garage:

  1. A surveyed site plan. Plans have to be referenced to a current plan of survey certified by a New Brunswick land surveyor, unless the Planning Director waives it. The permit form wants drainage, grading, setbacks, parking, inverts and water and sewer locations on that plan.
  2. A deposit. New buildings and additions, and renovations over $30,000, carry a deposit of 1.5% of the estimated cost, capped at $6,000. It is returned only after the inspections are passed, any wrongly placed foundation or drainage swale is corrected, and no Town property has been damaged.
  3. A Surveyor's Real Property Report. Any permit involving a new foundation or a foundation extension needs one, and the Town keeps the deposit until it arrives.
  4. A geotechnical report before backfill. The by-law requires it before the pre-backfill inspection, unless the Building Inspector specifies otherwise, so ask at application time whether yours will be waived.
  5. Inspection calls the inspector chooses. The by-law lists pre-footing, pre-backfill, pre-drywall and final, and lets the Building Inspector require "all or any combination" of them, each booked 48 hours ahead, not counting weekends and holidays. The inspector can also add a radon check before the slab is poured and a framing check (what each stage looks at).

Two more rules decide what happens to the dirt. The zoning by-law forbids stripping topsoil from a lot for sale, but surplus left over from a building project may be taken away. And within 12 months of the permit expiring, the front yard has to be graded to shed water away from the building and finished with at least 7.5 cm of topsoil.

The building permit checklist has a line for the manufacturer's engineered truss or floor assembly plans, where they apply (what goes into a 24-foot truss spec). Electrical and plumbing permits are separate provincial permits, not Town ones. The Province requires licensed electrical contractors to take out a wiring permit for work over 10 outlets or 5 kW, before construction starts and before the power is connected.

Water: two rules and one warning

The Municipal Plan says Oromocto is not flooded as severely as many Saint John River valley communities, because the 1950s plan kept the riverbanks as parkland, though it also admits nobody is sure flooding was the reason for that choice. That does not make every lot dry. The plan describes Oromocto West sloping toward the Oromocto River, from about 6 m of elevation on the floodplain up to 33.5 m near Black Watch Avenue. It names residential land at the end of Waasis Road West and around Waasis Road West and Harris Bridge Road as subject to flooding, and calls that an ongoing problem. The Town's own Public Works garage, on the Oromocto River behind MacDonald Avenue, was described in that 2016 plan as "prone to flooding annually".

  • 30 metres. The zoning by-law bars any building or other development within 30 m of a watercourse or wetland without approval from the provincial Department of Environment. The Province's rule is broader still: any work within 30 m, including clearing and landscaping, needs a Watercourse and Wetland Alteration permit.
  • 1 metre. No habitable space may be developed unless the top of its floor is at least 1 m above the recorded flood of record. Read literally, that reaches a garage turned into a bedroom or a loft apartment over the bays, so ask the Town before planning either on a low lot. The Planning Advisory Committee can also refuse any building on a site it considers subject to flooding, marshy or a wetland.
  • Check the lot first. The Province's flood hazard maps let you look up an address and include climate change projections to 2100. On a low lot, the foundation plan matters more than the siding choice (building a garage over a high water table).

The driveway cut belongs to the Town

A new garage usually needs a wider or new driveway, and in Oromocto the curb is lowered by the Town or its agent, not by your contractor. The Town's curb reduction form lists $300 plus HST for a one-slope cut of 2.5 m or less, $350 for two slopes, and $100 per linear metre above 2.5 m. The widest driveway it will cut for is 9.0 m, and the work happens no later than November 15, temperature permitting. Once the location is marked, the Works Department asks you to call 506-357-4409 to confirm it. Compare that with the approach widths people plan for in Fredericton, and book the cut early if you are pouring in the fall.

Who builds here, honestly counted

The New Brunswick Construction Network directory has 102 published businesses that list Oromocto in their service area. Only one of those 102 has an Oromocto address, and it is a landscaper. One more directory business is based in town without listing any service area: T&L Abatement and Remediation, which handles abatement and demolition, the pre-1980 asbestos step above. Neither builds garages.

Ten of the 102 offer a garage service. Five build garages, four of them from Fredericton and one from Moncton. Two install garage doors and three coat garage floors. For excavation, three listed firms serve Oromocto, all based in Fredericton. So if you are searching for a general contractor in Oromocto, expect the crew to come most likely from Fredericton, and check that they know the $50-versus-building-permit line before they draw.

Tell us about your Oromocto lot

Other towns on the river: Fredericton · Hampton · Sussex

Where these numbers come from

Everything above is from the Town's own by-laws and forms, Statistics Canada, or the Province. Contact the Town's Planning and Compliance Office at 4 Doyle Drive or 506-357-4500 before relying on any figure for a specific lot. By-laws are amended and fees change.

  1. Town of Oromocto Zoning By-law 522 (registered April 26, 2017): s.1.2(1), 1.2(2)(e), 4.0(2)(b), 4.0(9), 4.0(12), 4.0(13), 4.0(15), 5.1, 5.2. Amendments 522-A through 522-J, including 522-I (a Miramichi Road car wash), reviewed; none alters these sections.
  2. Town of Oromocto Building By-law 613 (registered November 1, 2024): s.3 definitions, 5(2), 7(3), 8(1), 9(1), 15(1)-(2), 18(2).
  3. By-law 613, Schedule A: Fees.
  4. Application for a Building Permit and Development Permit application with Schedule 1 (Accessory Building).
  5. Demolition Clearance Application (2025).
  6. Driveway Curb Reduction Application.
  7. Town of Oromocto: Building Permits & Licences and Planning & Compliance Office.
  8. Town of Oromocto Municipal Plan, March 17, 2016: s.2.2, 4.2.1, 4.2.2 and the Public Works garage discussion.
  9. Statistics Canada, 2021 Census Profile, Oromocto (town), CSD 1303012: dwellings by structural type, tenure and period of construction.
  10. Government of New Brunswick: Watercourse and Wetland Alteration Permit.
  11. Government of New Brunswick: Electrical wiring permits.
  12. GeoNB: New Brunswick Flood Hazard Maps and the Province's description of them.
  13. Directory counts: New Brunswick Construction Network published listings, counted September 26, 2026.